Friday, 7 November 2014

First Day of Production

My first day recording primarily focused around understanding the new tank and the layouts of lighting, camera, stool and back drop. Once doing this I was then able to begin shooting, these shots together added up to about 10 minutes of footage to play around with, with additional photography  for my ancillary tasks. 

The shots were similar in angle, size and focus, however I did change the colours of the ink. By the end of the shoot I did three separate drops of  Black, Yellow (Gold) and purple, I also merged some of these colours together. Therefore when layering the shots, it would be busier to match the deep base.

I will need to removed the background sound from the footage as it will be overplayed by the soundtrack, additionally, this will make it more professional and immersing. When uploading my footage to the Apple Mac, I encountered some technical difficulties; my camera was failing to connect and render my footage. After some figuring out what the inputs and outputs were doing and the specs selected for the given camera, I was able to render my footage fully without any looses. 

Here are the photographs I captured during the shoot; 












No comments:

Post a Comment